I have a fairly large shed that I want to clear out and build a mini in.
The space I have available is 9'W 15.5'L and has an open ceiling that's 8'H.
My idea is to build a Quarter Pipe on one end and a wall ride (straight up the wall, no coping) on the other to make up for the lack of length in the space.
I want the QP to be at least 2' high and have around 2' of deck and somewhere around a 6' radius.
I want the wall ride to be tight (for speed)(correct me if I'm wrong) but not too hard to skate.
I think, if I do this right, I can still manage about 7' of flat?
Any ideas?