Cutting out the transitions. I needed 8 transitions, so this part took awhile.
Painting the transitions. I didnt get a picture of it but before I did this I primered each transition front and back.
Other side of transitions painted. Ready to put a quarter pipe together!
First quarter pipe started.
And done. I think this was at about 2:30 in the morning.
1/10/08 Ready to be carried out. 3 more to go.
Got the second QP done...is it just me or is my garage getting smaller?
1/12/08 Both QPs carried out and put up on blocks. The Emo-looking kid in the background is my friend Potter. Hes not really Emo, he just wears black all the time and refuses to cut his hair.
My little tent to shield me from the cold.
1/14/08 Got the decks done and the flat bottom added.
1/27/08 Got one extension put up.
Got the other two QPs carried out and set down.
2/18/08 first layer of plywood.
Second layer's finished. Ready to start the other side
Other side
3/1/08 DONE! Better pics to come.
180 Disaster up the extension!
180 tailstall up
Handplant! Wooot!
Video
Notes
This is the process of me building my 12' wide, 3'8.5" high mini ramp. On each side it will have a 5' extension that is 4' wide.